Tuesday, 27 February 2018

Early Repairs to 500 UK Wind Turbines Will Cost Half a Billion

Guido Fawkes
500 UK offshore wind turbines need vital repairs earlier than expected in an enormous renewable energy blunder which could cost more than £500 million. The turbines, operated by Ørsted and supplied by Siemens, need repairs to the leading edge of blades that eroded after only a few years at sea. At one wind farm off Duddon Sands, Cumbria, all 108 wind turbines have erosion problems, requiring removal and reconditioning. Repair entails the application of a rubber coating, meaning blades must be brought ashore. Costs including repair boat chartering and allowing for lost generation and income are estimated as around £1 million per turbine."