Tuesday, 20 December 2011

Her Royal Hydropowered-ness: Queen goes green as second 40-ton turbine is moved into position on the Thames to power Windsor Castle

Daily Mail
"The Queen will be green in just over a month when a hydropower station on the River Thames is finally completed. The second of two custom-built turbines - the largest in the UK - was lifted into place by a crane on a water barge during a delicate 30-minute operation today.The 40-ton turbines form part of a £1.7million scheme to provide hydro-electric power to Windsor Castle."

ED: Taxpayer Funded ..???

No comments:

Post a Comment